Full cycle engineering

 

1. Проектирование - Инжиниринг ТОО Топан.png

     Design:

  • Complex design assessment;

  • Picking up engineering solution;

  • Arrangement of technical specifications;

  • Quotation;

  • Signing the project contract;

  • Design (drawings, schemes, system description, calculation);

  • Customer's project confirmation;

  • Signing the production contract.
 

2. Этапы изготовления - Инжиниринг ТОО Топан.png

     Production stages:

  • Production of process piping;

  • Installing of isolating valves and units;

  • Installing instruments and controls, safety etc.;

  • Configuration and setup automation systems;

  • Installing lighting, heating and ventilation systems;

  • Installing cables and tubes;

  • Factory testing;

  • Factory hydro-testing.

 

3. Монтаж - Инжиниринг ТОО Топан

      Installing:

  • Preparing period and transportation;

  • Installing at the place of installation;

  • Checking after transportation and installation;    

  • Checking for voltage;

  • Setup automation systems.

 

4. Пуско-наладка - Инжиниринг ТОО Топан

      Pre-commissioning:

  • Complex 72 hour testing;

  • Metrological certification;

  • Facility commissioning (within coordinated testing period);

  • Put into operation.