EN RU

ken-sary llp

ken-sary llp 21.01.2013

ken-sary llp

Dear ladies and gentlemen!
By the results of the cooperation of our company with Topan LLP we express ourgratitude to this company for the quality work executed under the contract No. 914 dd.23.04.2014 – “Design, manufacturing, including delivery, installation and testing at the Oil Custody Transfer Station of Arystanovskoye field (Oil Custody Metering Station)”.
During the contract implementation the following scope of work was completed:
•    Detailed Engineering;
•    Manufacturing and installation of equipment (Oil Cutody Metering Station);
•    Development of technical documentation;
•    Equipment delivery (Oil Custody Metering Station)
•    Commissioning works;
•    Metrological certification;
•    Registering in Rok Register.
•    During the period of work execution Topan LLP has shown itself as a highly professional company with a qualified staff who address the set tasks in an operative and quality way.
General director Tazhigaliyev Ye.U.

← Возврат к списку